As of 01.01.2024, Γ1/Γ1Ν becomes the Special Tariff for Residential Use.
Variable rate electricity product with no time commitment for customers with or without a dual-rate meter. For Regular charge period consumption, a single fixed fee is applied, the amount of which varies according to the total 4-monthly consumption. For those with a dual-rate meter, energy is charged at a lower rate during reduced billing hours.
The product allows for repayment in up to 6 interest-free installments with a credit card for amounts of €200 or more (VISA or MasterCard).
As of 01.01.2024 Γ1/Γ1Ν becomes the Special Tariff for Residential Use.
* The displayed final prices of the Reduced charge period (for those with dual-rate meters) include a 39.4% discount off the February 2025 basic supply prices and the Fluctuation Mechanism charge.
The State Subsidy applies to the first 500 kWh of the regular and the reduced charge period.
* The displayed final prices of the Regular charge period include a 36.2% discount off the February 2025 basic supply prices and the Fluctuation Mechanism charge.
The State Subsidy applies to the first 500 kWh of the regular and the reduced charge period.
The Supply Charge will result from a fixed component (Basic Supply Price) and a variable component (Fluctuation Mechanism) and will be reflected in the electricity bill as a single price (Final Supply Price). The final price of each month will be posted on our website www.dei.gr by the 1st day of each month of consumption and will be accompanied by a detailed file with information on how to verify the price.
In particular, in the Special Tariffs the charges consist of:
Suppliers are required to indicate the final supply price uniformly per month of invoicing in consumption bills relating to the Special Tariff.
Learn more here.
The Special Terms, which were applicable and valid on 01.12.2024, will continue to apply beginning 01.01.2025.
HEDNO defines the timeframe for the dual-rate reduced tariff system.
Winter period from November till March, as of 01.02.2025:
Summer period from April till October:
Residential supplies with a dual-rate meter automatically transitioned to the new timetable on 01.02.2025. The sole exclusions are supplies that, due to HEDNO technical reasons, cannot be automatically changed to the new zones and must continue to operate under the old schedule, applied before 01.02.2025. These customers are notified individually by a letter included in their bill (the first one they will receive after 01.02.2025), and they can submit a request to HEDNO to be included in the new schedule.
Customers can address HEDNO about whether they have switched to the new dual-rate schedule in the following ways:
In case you wish to apply for a Night meter, you need to:
1. contact HEDNO to submit the relevant application
2. contact us to sign a new contract under your name.
You can find out if you have a segmented or continuous timetable by checking the supply meter. Specifically, if your meter registers consumption on the counter with the M indication (reduced tariff) or on the counter with the K indication (regular tariff) during the Reduced charge period.
To determine whether you are integrated into the continuous or segmented timetable, you can address HEDNO.
A) By checking your bill:
On the back page of the bill appears "PPC Supply ". On the back page of the Actual bill, in the section "PPC Supply Charges", "Energy Charge - Regular" and "Energy Charge - Reduced" are displayed separately and directly below the charges and consumption quantities per zone.On the top left side, you will find in detail the readings of your meter, while in CODE 12 you will find your reduced charge period consumption.
B) By checking your supply meter:
You can check whether you have a dual-rate meter; in other words, whether there are two counters on your meter. One marked K and one marked M. Then, when the night tariff applies, whether your meter registers the consumption on the counter marked M.
C) By checking the distribution board at your home
In several cases there is an indicator light on the distribution board of your home which is connected to the additional service conductor.
Discover our add-on services and enjoy multiple benefits!
Feel safe at home if you suddenly need an electrician, plumber, or locksmith… and everything will be done in no time!
Feel safe at home if you suddenly need an electrician, plumber, locksmith or os gas boiler technician for Natural Gas.
Your home energy supply becomes sustainable easily and quickly.
Green energy is the future. The new GreenPass add-on service by PPC guarantees that the equivalent amount of energy you consume is generated and reserved from renewable sources.
With bluePass, you get 50 kWh per month on the network of publicly accessible PPC blue chargers, plus another 50 kWh for charging at home.
Select your preferred contact method
Our website has detected that you are using an outdated browser that will prevent you from accessing certain features.
In order to improve your browsing experience we strongly recommend you use the links below to update to one of the following modern browsers.